Site Readiness & Access Planning
We’ll coordinate with you to confirm access points, delivery schedules, a safety management plan, and any site-specific considerations before we begin.
Your site is in expert hands.
With over 1,600 projects delivered since 2012, Smart Commercial Solar is Australia’s most experienced commercial solar installer. We've managed multi-site rollouts ranging from five to 150 locations for brands like Bunnings, KFC and Officeworks, developing deep expertise in coordinating every step involving many different stakeholders.
This page outlines what to expect throughout the process, from site preparation and installation to final commissioning and ongoing support.
Your site may be receiving one or more of the following solutions as part of an integrated energy system designed to reduce emissions and save money.
Solar panels to generate renewable electricity
Battery storage to store excess energy
Commercial EV Chargers chargers to support electric vehicles
A multi-site solar rollout involves solar installations across multiple locations for a single client. Unlike standalone installs, these projects require centralised planning but site-specific execution, with standardised processes that can adapt to varying roof conditions, electrical setups, and operational requirements across different locations.
The key difference is scale coordination - we're managing multiple project timelines simultaneously while maintaining quality and consistency across all sites.
Our safety measures include comprehensive risk assessments for each site, daily pre-start meetings, and strict adherence to working at heights protocols. All personnel hold relevant certifications and we maintain edge protection systems where feasible.
Communication happens through multiple channels - we share final safety and design documentation at least one week before installation, and maintain regular contact with site managers throughout the process.
We’ll coordinate with you to confirm access points, delivery schedules, a safety management plan, and any site-specific considerations before we begin.
Solar panels, inverters and other gear will arrive by truck. You’ll be notified in advance and told how many car spaces or loading zones are required.
A general rule of thumb for how long we'll be on site is one week per 100kW installed. Most of the work happens on the roof and in switchboard areas.
During installation, we’ll set up signage, barriers and exclusion zones as per the Safety Management Plan and Safe Work Method Statement (SWMS).
Sites require a short electrical shutdown (2-4 hours) to complete final connections. We’ll coordinate with you well in advance to ensure this is minimally disruptive.
We’ll carry out inspections and performance checks to make sure everything’s working exactly as designed.
Once the system is switched on, we’ll give you a handover pack, access to your monitoring portal, and details for support.
Program Head
Project Lead
Project Engineer
Your project manager will provide a tailored project timeline for your site, including start and finish dates.
Commercial solar installations typically take approximately one week per 100kW, with some variation based on factors like roof access and weather conditions. So, if we're installing a 300kW system, expect us to be on site for roughly three weeks.
Most of the work is completed without impacting daily operations. We do require a short shutdown for electrical works, and we’ll coordinate timing with site management in advance.
Generally, between 7am and 5pm, Monday to Friday. We’ll confirm exact hours closer to your site’s installation date.
Some noise is expected during specific stages (e.g. roof mounting), but we aim to keep disruption minimal. No heavy construction is involved. Dust is rarely a concern.
We’ll let you know if any areas — like car parks, driveways or internal spaces — need to be cleared or made accessible before work begins.
Yes. Our team may need access to areas like switchboards, metering panels, or communications rooms. Your Project Manager will confirm with the team on each individual site what will be needed ahead of time.
Smart take safety very seriously, as do all contractors we work with. All work complies with WHS regulations. We’ll use signage, barriers and exclusion zones, as well as daily safety meetings to ensure safety for your team and ours.
Nothing major. We just ask staff to follow safety signage and avoid designated work zones while installation is underway.
We’ll provide notice ahead of time. Deliveries may include solar panels, mounting frames, inverters, and electrical equipment.
Typically, 4 to 6 pallets per site for an average-sized commercial solar installation. Each pallet requires between half, to one full car space.
We may need a small number of car spaces for equipment and crew access, generally over 2–5 days. We’ll work with you to minimise impact.
Yes, depending on your roof layout and access. We’ll advise which days this equipment will be onsite and set up exclusion zones.
We’ll coordinate with you ahead of time to arrange suitable parking close to the work area.
You’ll be introduced to your site’s dedicated contact from the Smart Commercial Solar Project Management team before work begins. If questions or issues arise which require management involvement, our Program Head, or the Head of Projects & Performance can be involved.
We’ll send brief updates by email or phone as needed. Any major changes will be discussed with you directly.
Yes. We’re happy to provide approved messaging or visuals if you’d like to share updates internally or externally.
Once the solar system is installed, it can’t be commissioned (i.e. turned on and exporting to the grid) until the Distributed Network Service Provider (DNSP) completes their required steps. This typically includes:
Approving the connection application (if not already done)
Installing or reconfiguring the meter (to handle solar export/import properly)
Issuing permission to connect (PTC) or equivalent documentation
Only after the DNSP confirms everything is in place — especially the meter — can the system legally be commissioned and begin operating.
The timing and process vary by state and DNSP (e.g. Ausgrid, Essential Energy, Powercor, etc.), so lead times can differ.
Upon completion, you’ll receive a handover pack with system documentation and login access to your monitoring platform. Our Performance team will take over from here, granting you access to our Smart Performance Hub and talking you through your new monitoring software.
Minimal routine maintenance is required. For the first year after installation, your system will be maintained free of charge through our Smart Active management package. Our Performance team monitors your system remotely during this time and will flag anything that needs attention.
Smart Commercial Solar handles both scheduled maintenance and issue resolution. If there’s a fault, we’re often the first to know via monitoring systems, but you can also contact our Performance team directly at any time.
Your Project Manager will connect you with this team after completion.
You’ll have access to a live monitoring portal that shows real-time performance, cost savings and carbon offsets.
Your Performance contact will help you get familiar with the system so you can track system output over time.