Edmondson Park Station

railcorp.png
edmonson-park-solar
Smart Commercial Solar provided systems of exceptional quality and value for the Glenfield Leppington Rail Link. Despite some difficult working conditions, the SCS team worked hard and achieved a very successful result, without too much hassle.
It was a pleasure working with their team; a very hands-on management style meant that small issues were able to be overcome quickly.
— John Brumec | Project Manager
  • 75kW System
  • 300 x 250W Trina Poly ‘Black’ panels
  • 4 x SMA STP20,000TL Inverters

Edmondson Park Station is the second last train station on the South West Rail Link, and will service 6,700 new homes being developed in the area.

This project had some very unique challenges. A restrictive installation program with multi-level management, a high level of oversight driving a level of Quality Assurance that most solar companies would not be able to achieve. This meant that Smart Commercial Solar had to tick many boxes not found within a standard scope of works, and did so without any faults, defects or issues.

Four electrical engineering inspections from Infrastructure NSW, Transport for NSW, John Holland Commercial and Stowe Electrical scrutinised all aspects of our execution. We impressed them at all levels.

The result is one of Australia’s highest quality solar power installations. 

Ed Park Station.jpg